⌘K
Design Effectiveness and Post-Design Evaluation
Design management doesn’t end with drawing issuance — post-design evaluation ensures lessons are captured for continuous improvement.
1. Design Effectiveness Metrics

2. Post-Design Review
Conducted after project handover to evaluate:
- Actual constructability issues encountered.
- Rework and design-related claims.
- Coordination bottlenecks between disciplines.
- Lessons for future design management systems.
3. Continuous Improvement Actions
- Update design templates and checklists.
- Document best practices in a Design Lessons Learned Register.
- Conduct team workshops for knowledge transfer.
“Reporting is not about documenting progress — it’s about driving it.”
Module Summary
- Design management aligns multi-disciplinary teams through structured workflows.
- Scope control during design prevents overruns and disputes.
- Coordination meetings ensure continuous alignment and accountability.
- Constructability reviews validate buildability; Value Engineering enhances efficiency.
Post-design evaluation transforms experience into excellence.