Work Breakdown Structure (WBS)

The Work Breakdown Structure (WBS) is a hierarchical representation of project work that breaks down the overall scope into smaller, manageable components.

It provides a clear structure of deliverables, tasks, and resources — ensuring effective project planning, execution, and cost control.

Overview

A WBS divides a project into multiple levels of detail, starting from high-level deliverables and breaking them into smaller work elements.

It enables teams to define responsibilities, assign resources, estimate costs, and monitor progress efficiently.

Steps to Create a WBS

  • Navigation Path:

Log in to the application → Go to Project Overview Page → Left Menu → Click WBS.

  • Create WBS:

Click on the Create WBS button to open the creation pop-up.

Create WBS – Popup Fields

Basic Information

  • Project Name: Auto-filled based on the selected project.
  • Parent WBS: Select the parent WBS if applicable.
  • WBS Name*: Enter the WBS name (mandatory).
  • Owner*: Select the owner responsible for the WBS.
  • Start Date / End Date: Select the WBS duration.

Dates must fall within the Project Start Date and Project End Date.

Dependency Configuration

  1. Select WBS: Choose an existing WBS to establish a link.
  2. Link Type: Choose between Predecessor or Successor.
  3. Dependency Type: Select one of the following relationships:
    • Finish to Finish (FF)
    • Finish to Start (FS)
    • Start to Finish (SF)
    • Start to Start (SS)

Resource Allocation

Select the required resources for the WBS:

  1. Resource Name: Choose from the dropdown.
  2. Unit: Select from (Hour, Day, Week, Month).
  3. Duration: Enter total working duration.
  4. Cost Per Hour: Specify rate per hour.
    • The Base Cost and Project Cost are auto-calculated.
  5. Add multiple resources by clicking the (+) icon next to the cost field.

Item Allocation

Add the required items linked to the WBS:

  1. Item Name: Select from the dropdown (fetched from Company Settings → Item Master).
  2. UOM & Unit Price: Auto-filled upon item selection.
  3. Quantity: Enter the required quantity.
    • The Base Cost and Project Cost are automatically calculated.
  4. Add multiple items by clicking the (+) icon.

Asset Allocation

Add the required assets for the WBS:

  1. Asset Name: Select from the dropdown (fetched from Company Settings → Asset Master).
  2. UOM & Unit Price: Auto-filled automatically.
  3. Quantity: Enter the quantity of assets to be used.
  4. Cost Calculation:
    • The Base Cost and Project Cost are auto-calculated.
  5. Add multiple assets using the (+) icon.

Skill Requirement

Select the required skills for the WBS:

  • Skill Name: Choose from dropdown (configured in Company Settings → Human Capital Section).

Cost Summary

  • The Total Estimated Cost for the WBS is automatically calculated based on the total cost of all resources, items, and assets used.

Additional Information

  • Description: Add relevant notes or details for the WBS.
  • Click Save to create and record the WBS.

WBS Listing Page

The WBS listing page displays all existing WBS records with key details such as:

  • WBS Title
  • Start Date
  • Due Date
  • Estimated Cost
  • Allocated Cost
  • Remaining Cost

Actions Available:

  • View – Opens the WBS details page.
  • Edit – Modify existing WBS information.
  • Delete – Remove WBS record.

WBS Details Page

Displays comprehensive information about the selected WBS:

  • Project Name
  • WBS Name
  • Status (Active, In-Progress, On-Hold, Delayed, Completed)
  • WBS Owner
  • Start Date
  • Due Date
  • Total Estimated Cost
  • Allocated Cost
  • Description

WBS Actuals

  • On the WBS Details Page, click Add Actuals in the header section.
  • This allows users to input actual data for cost, duration, and progress.
  • All actual entries are reflected dynamically in the WBS detail summary.

Linked Details Displayed in WBS Details Page

The following linked components are displayed:

  • Linked WBS
  • Resources
  • Items
  • Assets
  • Skills
  • Activities
  • Actuals