⌘K
Quality, Safety, and Resource Control
1. Quality Management
- Establish a Project Quality Plan (PQP) with inspection & test protocols.
- Conduct Incoming Material Inspections and Field Quality Checks.
- Maintain Inspection Test Records (ITRs) and Non-Conformance Reports (NCRs).
- Perform regular Quality Audits and Mock-ups.
Key Principle: Plan → Do → Check → Act (PDCA) cycle.
2. Safety Management
- Implement Safety Management Plan (SMP) and Job Hazard Analysis (JHA).
- Conduct toolbox talks, induction, and safety drills.
- Enforce PPE compliance, scaffolding checks, and permit-to-work systems.
- Track safety KPIs — LTI Rate, Near-Misses, Audit Scores.
“Zero accidents is not a slogan — it’s a system.”
3. Resource Control
- Use Resource Histograms to monitor manpower deployment.
- Optimize equipment usage through preventive maintenance.
- Track daily consumption of key materials vs. budget.
- Use software-based dashboards for cost and productivity control.